Project Overview
This project holds a special place in the history of Noble Power Solutions as it was the first large scale project awarded.
Noble Power Solutions worked with RCR Tomlinson to undertake the required testing and commissioning of the site main 11kV Reticulation System at the new MMG Dugald River Mine in Queensland. The scope of works included testing of the protection relays, battery chargers and DC systems, current transformers, voltage transformers, circuit breaker and associated switchboards. In addition to the 11kV equipment,
With the testing and pre-commissioning works successfully completed ahead of schedule Noble Power Solutions was requested to undertake the testing and pre-commissioning of the 400V MCC protection devices.
This site also uses IEC61850 for signalling between protection devices for circuit breaker failure and under frequency load shedding requiring detailed testing and commissioning.
As the Dugald River site is an underground mine site it is required to install Neutral Earthing Resistors (NER) on all feeders supplying underground equipment. Noble Power Solutions configured, tested and commissioned the protection devices associated with the NER as well as the continuous monitoring equipment installed to ensure the NER is operational at all times, a critical safety feature of underground mining.
Helping our clients succeed.
Developing and nurturing strong relationships is the key to success.
Noble Power Solutions was established in 2016 offering more than 15 years experience of specialist testing, commissioning and electrical engineering services to the power generation, transmission, distribution and end user industries.
Our attention to detail, focus on safety and rare combination of experience, skills and capabilities is what we believe makes Noble Power Solutions stand out from the competition.
Noble Power Solutions has a fully Integrated Management System (IMS) certified as complying with the requirements of ISO9001:2015, ISO14001:2015, ISO45001:2016 and AS/NZS 4801:2001.